色永久第一色_精品日韩人妻一区二区_国产同性恋精品无码视频_亚洲av日韩av偷拍偷拍_亚洲嫩草AV永久无码_性爱视频一区二区免费看_91啪啪精品_黄色视频A片区_国产91啪视频好日子_一区二区三区大香蕉_亚洲无线观码_人操欧美视频_诱人熟女亚洲_久久久久,黄色一级片_av嫩草

NEWS

Analyzing the Jump detection steps of the piston rod

1. During one stroke of reciprocating piston movement, check the horizontal and vertical radial runout of products at all levels to check the comprehensive maintenance effect of the motion mechanism.
2. Measure the vertical runout: The dial is accurately installed at the top 12 o'clock position of the piston rod, close to the sealing packing, and the pointer on the dial should be perpendicular to the piston rod body. Measurement of vertical runout: The dial is set at the 3 or 9 o'clock position, in close contact with the packing, depending on the closest possible "close distance".
3. The connection between the plunger rod and the crosshead should be correctly opened, and the crosshead should be flat and evenly attached to the slide rail. The gap between the slider and the slide should not be 0.04 millimeters at 6 o'clock, and the gap between the four angle feeler gauges placed in the slide should be consistent.
4. Press and hold the "handle" on the dial, and the pointer on the dial will rotate on the surface of the dial, making the pointer face the zero mark on the dial surface.